CITY OF PEORIA, ARIZONA
COUNCIL COMMUNICATION
 
Agenda Item: 8C. 


Date Prepared:  1/10/2017 Council Meeting Date: 2/7/2017

TO:Carl Swenson, City Manager 
THROUGH:
Julie Arendall, Deputy City Manager 
FROM:  John Imig, IT Director/CTO 
SUBJECT:
Expenditure and Budget Adjustments, Construction of Northeast Peoria (Pyramid Peak) Communications Site 

Purpose:

A new communications site is needed to provide enhanced radio coverage primarily in the northeast part of Peoria. Due to the mountainous terrain, the existing radio system does not provide adequate radio coverage for this area. The site plans include a lattice-style tower and moving an existing shelter to house the site radio equipment.
Background/Summary:

A need for the new site was identified in late 2015, when it was determined no current radio site will support adequate radio coverage in northeast Peoria, especially in the Sonoran Mountain Ranch area. Coverage studies indicated that a location within the Pyramid Peak Water Treatment Plant is positioned to provide the necessary coverage.

 

As part of Peoria's participation in the Regional Wireless Cooperative (RWC), funding was allocated for infrastructure upgrades beginning in FY2014 and continuing through FY2018. Due to decreased costs for the RWC upgrades, Peoria's share of the infrastructure upgrades is significantly lower than what has been paid and budgeted to date. Savings have also been identified within the Radio Operations budget due to lower than anticipated RWC operating costs.

 

Staff is proposing these savings be used to fund the Northeast Peoria Communications Site to improve radio coverage in north Peoria.

Previous Actions:

None
Options:

A. Approve expenditures in the amount of $1,216,577 for the construction of a new Northeast Peoria (Pyramid Peak) Communications Site and related budget adjustments. 

 

B. Deny approval of expenditures in the amount of $1,216,577 for the construction of a new Northeast Peoria (Pyramid Peak) Communications Site and related budget adjustments, which will not provide improved radio coverage in north Peoria.

Staff Recommendation:

Discussion and possible action to: (a) approve expenditures in the amount of $1,216,577 for the construction of a new Northeast Peoria (Pyramid Peak) Communications Site; (b) approve a budget adjustment in the amount of $1,216,577 from various accounts to the Improvements Other than Land and Buildings Northeast Peoria (Pyramid Peak) Communications Site account and the Radio System Operations Improvements Other than Land and Buildings Northeast Peoria (Pyramid Peak) Radio Communications Site account.

Fiscal Analysis:

Staff request that Council approve expenditure authority for this project in the amount of $1,216,577. To support this authority, staff requests the following budget adjustments.

 

  • $850,102 budget adjustment within the CIP Projects fund from the Computer Hardware account and RWC Radio Infrastructure Replacement project (4550-4550-542008-CIPOF-IT00024) to the Improvements other than Land and Buildings account and Northeast Peoria (Pyramid Peak) Communications Site project account (4550-4550-541003-CIPOF-IT00035).
  • $202,917 budget adjustment from General Fund Contingency (1000-0300-570000) to CIP Projects fund Improvements other than Land and Buildings Northeast Peoria (Pyramid Peak) Communications Site project account (4550-4550-541003-CIPOF-IT00035).
  • $63,533 budget adjustment from General Fund Contingency (1000-0300-570000) to Radio System Operations Improvements other than Land and Buildings Northeast Peoria (Pyramid Peak) Radio Communications Site account (3300-3760-541003-CIPOF-IT00035).
  • $100,025 budget adjustment from Radio System Operations Telecommunications R & M account (3300-3760-524008) to Radio System Operations Improvements other than Land and Buildings Northeast Peoria (Pyramid Peak) Radio Communications Site account (3300-3760-541003-CIPOF-IT00035).
Narrative:

Upon approval of expenditures to construct the new Northeast Peoria (Pyramid Peak) Communications Site, the project team consisting of representatives from Peoria, Phoenix, Glendale, and RWC will commence the construction of the project. An existing City of Phoenix contract with Motorola (#124391) will be used for the construction of the site. An existing State of Arizona contract with Microwave Networks Incorporated (#ADSPO13-00003085) will be used for the microwave equipment and installation.

 

Contact Name and Number:  

John Imig, (623) 773-7253